Home / Blogs / Blogs / Step-by-Step Guide To Installing Aluminium Window Profiles for Optimal Performance

Step-by-Step Guide To Installing Aluminium Window Profiles for Optimal Performance

Views: 0     Author: Site Editor     Publish Time: 2025-07-09      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button
Step-by-Step Guide To Installing Aluminium Window Profiles for Optimal Performance

Aluminium window profiles have become a preferred choice in modern construction due to their sleek design, long-lasting durability, and resistance to corrosion. Whether used in homes, offices, or commercial buildings, these windows contribute significantly to energy efficiency, sound insulation, and overall aesthetics. However, all these benefits depend on one crucial factor—the quality of installation. Even the highest-grade aluminium profile won’t perform well if it’s not properly installed. This guide offers a complete, easy-to-understand explanation of the aluminium window installation process, with a focus on achieving optimal performance.


Preparing the Window Opening

Every successful window installation begins with proper preparation. The area where the window will be fitted—often called the structural opening or rough opening—must be inspected carefully. It should be clean and free of dust, cement residue, or broken bricks. Using a tape measure, the installer should check the height, width, and depth of the opening at multiple points to confirm whether the space is square and even.

Ideally, the opening should be slightly larger than the aluminium window frame itself. This small gap around the frame—often just 10 to 20 millimeters—allows space for insulation materials, sealing foam, and adjustments during installation. It’s also critical to check that the opening is plumb and level. If it’s out of alignment, the window may not sit properly, leading to sealing problems, water leakage, or difficulty in operating the sash.


Assembling the Aluminium Frame

Some aluminium window systems arrive on-site pre-assembled from the factory. Others may be shipped in parts, especially when the frame is too large or has been custom-designed. In such cases, the frame must be assembled at the job site. The head, sill, and jamb sections are connected using screws, brackets, or corner cleats, depending on the system design.

Sealant is usually applied at all joining points to ensure water-tightness. Once assembled, the frame must be rechecked for squareness. One simple way to do this is by measuring diagonally from corner to corner—if both diagonal measurements are equal, the frame is square.


Placing the Frame in the Opening

The next step is positioning the aluminium frame into the prepared opening. This is known as dry fitting, because no fixings are used at this stage. The goal is to check how well the frame fits and to make sure it sits level and straight without any pressure or bending. Small plastic shims or packers are placed under the corners and sides of the frame to support it evenly.

Using a spirit level, the installer adjusts the shims until the frame is vertically plumb and horizontally level. It’s also important that the window frame is aligned properly with the inner and outer edges of the wall so that once finished, the window will look symmetrical and function correctly. Taking extra time during this dry fitting stage helps avoid issues later on.


Securing the Frame in Position

Once the frame is properly aligned and supported, it can be permanently fixed into place. Screw holes are typically drilled through the aluminium frame into the surrounding wall at specific intervals. These holes are usually located near each corner and spaced evenly along the vertical and horizontal members of the frame.

Wall plugs are inserted into the drilled holes in concrete or brick walls, and then screws are used to anchor the frame. These screws must be tightened firmly but not excessively, as over-tightening can warp the aluminium and affect the functionality of the window. The installer should continuously recheck the level and alignment of the frame during this step to make sure nothing shifts out of place.


Sealing and Insulating the Perimeter

Sealing the gap between the frame and the wall is essential to ensure thermal insulation, airtightness, and moisture protection. The most common approach is to fill this space with low-expansion polyurethane foam. This foam acts both as an insulator and a cushion, holding the frame securely in place and preventing drafts.

Once the foam has expanded and hardened—usually within 30 minutes—it can be trimmed flush with the wall. To prevent water from seeping into the wall cavity, a high-quality silicone sealant is applied around the exterior edge of the frame. On the inside, a vapor barrier or acrylic sealant may also be used to enhance energy efficiency. All these materials must be carefully applied and smoothed to avoid air pockets and ensure a tight, continuous seal.


Installing the Glass Pane

If the aluminium window frame does not come with pre-installed glass, the next step involves inserting the glazing panel. First, rubber gaskets or setting blocks are positioned inside the frame to support the glass. Then the glass pane is lifted carefully and set into place. Suction lifters are often used for larger panes to ensure safe and accurate handling.

Once the glass is in place, aluminium glazing beads are clipped or snapped into the inner edges of the frame. These beads lock the glass securely while also allowing for easy replacement in the future. Some systems may include pressure plates or additional gaskets for better sealing and structural integrity. After this, a final inspection ensures the glass is evenly supported and not under stress.


Fitting the Hardware and Making Adjustments

After the glass has been secured, the installer can focus on the operating components of the window, such as hinges, handles, locking mechanisms, and rollers (in the case of sliding windows). These parts must be installed according to the manufacturer’s instructions and should align perfectly with the frame.

Once everything is in place, the window is tested to ensure it opens and closes smoothly. Minor adjustments can be made to the hardware or sash position to correct any misalignment or resistance. If the window includes a multi-point locking system, it should be tested fully to confirm that all locking points engage properly. Lubricating the moving parts with silicone spray will help maintain smooth operation over time.


Completing the Interior and Exterior Finishing

To complete the installation, the visible gaps and foam around the window are covered with trim or finishing profiles. On the exterior, aluminium flashing or sealing tape may be used for added protection against water ingress. On the interior side, decorative moulding or plasterwork is applied to blend the window into the wall.

This final step is not only about aesthetics; it also helps protect the insulation materials and improves the overall airtightness of the installation. Once this is done, all surfaces are cleaned, any protective film on the glass or aluminium is removed, and the window is ready for long-term use.


Maintaining Your Aluminium Windows

Although aluminium windows require less maintenance than wood or steel alternatives, routine care is still necessary to keep them in top condition. The frames can be cleaned with mild detergent and water every few months. Hinges, rollers, and locks should be lubricated at least once a year. Rubber seals and gaskets should also be checked occasionally and replaced if they become brittle or cracked.

Paying attention to these small details ensures that your aluminium windows will continue to perform efficiently, resist corrosion, and look great for many years.


Conclusion

Installing aluminium window profiles is a process that combines careful measurement, precise alignment, proper sealing, and attention to functional detail. When done correctly, it results in windows that are energy-efficient, secure, and visually appealing. Each stage of the process—from preparing the opening and securing the frame to sealing, glazing, and adjusting hardware—contributes to the overall performance of the window.

Whether you're a professional installer or a property owner overseeing a new project, understanding the full installation process will help ensure high-quality, long-lasting results. Good aluminium windows begin with good installation—and that makes all the difference.

 

ABOUT US
Foshan Newsky Aluminum Co., Ltd. is a large-scale comprehensive aluminum profile Enterprise Group, reaching a relatively advanced level in design and production of aluminum profile. Founded in 2001, the factory located in Foshan City, Guangdong Province.
CONTACT US
 Dinghu industrial District, foshan, Guangdong Province, China​​​​​​​
 HONGKONG OFFICE :M03, 24/F, Ho King Comm CTR, 2-16 Fayuen ST, Mongkok Kowloon, Hong Kong.
 +86-13928650090
 +86-13928650090
 +86-13928650090 
Copyright © 2024 Foshan Newsky Aluminum Co., Ltd. All Rights Reserved. | Sitemap